内部压力下的EPB-TBM隧道:评估可维修性

EPB-TBM tunnel under internal pressure: Assessment of serviceability

论文作者

Labanda, N. A., Sfriso, A. O., Tsingas, D., Aradas, R., Martini, M.

论文摘要

Mantanza-Riachuelo盆地恢复是阿根廷正在建设中最雄心勃勃的环境项目之一。在这种情况下,布宜诺斯艾利斯大都会地区(AYSA)的卫生局正在建立一个污水收集网络,以运输该市南部地区人口的废水,由近500万人组成。这个大型项目中最复杂的隧道被命名为\ textit {lot 3},这是一条从位于\ textit {rio de la la plata}的竖井开始,在河流下方奔跑12公里,到达放电区。 该隧道贯穿属于\ textit {post-pampeano}的质量软粘土,\ textit {puelchese}地层的密集沙子。在运行中,它将被一个泵站加压,该泵站将产生一个压力仪头,在第一个2000 m中,它最终可能高于隧道周围的封闭压力。 本文使用面向风险的方法对作用在隧道环上的结构力进行了数值分析,该方法考虑了材料,地层和隧道 - 地面相互作用的随机性质。评估衬里的压缩并将其与现场测量值进行比较,以预测超出系统结构能力的张力的结构力和张力的风险。

The Mantanza-Riachuelo basin recovery is one of the most ambitious environmental projects under construction in Argentina. In this context, the sanitary bureau of the metropolitan area of Buenos Aires (AySA) is building a sewage collection network to transport the waste water of the population in the southern area of the city, composed by almost five million people. The most complex tunnel in this big project is named \textit{Lot 3}, an outfall EPB-TBM tunnel starting at a shaft located at the \textit{Rio de la Plata} margin and running under the river 12 km to a discharge area. The tunnel runs through soft clay belonging to the \textit{post-pampeano} formation and dense sands of the \textit{Puelchese} formation. In operation, it will be pressurized by a pumping station which will produce a piezometer head that, in the first 2000 m, might be eventually higher than the confining pressure around the tunnel. This paper presents the numerical analysis of the structural forces acting on the tunnel rings using a risk-oriented approach that considers the stochastic nature of materials, stratigraphy and tunnel-ground interaction. The compression of the lining is evaluated and compared with field measurements in order to predict the structural forces and the risk of the rings going into tension beyond the structural capacity of the system.

扫码加入交流群

加入微信交流群

微信交流群二维码

扫码加入学术交流群,获取更多资源